NEW YORK, NEW YORK – September 26, 2016 – GameChange Solar announced that 17MW of the GameChange Solar precast ballasted ground systems were installed on five landfills in Massachusetts by a leading EPC for the nation’s most prestigious solar landfill developer.
Precast Ballasted Ground System
• Supports all poly and thin film panels for all vendors• Foundations may be precast at site or nearest precaster location
• Integrated grounding and wire management
• Full layout and engineering analysis for every project
• Wind tunnel tested by industry leader CPP & rated for 150 mph wind speed
• Independent assessment by Black & Veatch
• Rated up to 90 psf snow load
• ETL/UL 2703 tested
• Warranty 20 years