MAXSPAN

Best Quality & Priced Post Driven Fixed Tilt Systems

CLICK TO REQUEST A QUOTE

FASTER
INSTALLING

  • Integrated Hardware cuts part count and speeds install
  • Fewer foundations than competing systems, which also means less posts and less post installation cost. As few as 130 posts per MW

STRONGER
STEEL

  • High strength steel and truss engineering combine to make industry’s longest spans and lowest post counts as few as 190 per MW for 2 up portrait and 130 per MW for 3 up portrait
  • Stronger steel allows for less thickness and weight, which means lower equipment and shipping cost

SUPERIOR TERRAIN
NAVIGATION

  • Patent pending articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket adjustment handle up to 15% east-west terrain slopes and undulations
  • Long slots enable three axes of adjustability demanded by installers for navigating real world site conditions

Single Post System

2-4Up in Portrait - Wide Flange Post
(4-8Up in Landscape Available)

Single Post System

2-4Up in Portrait - Screw or Helical Post
(4-8Up in Landscape Available)

Single Post EastWest System

2-4Up in Portrait - Wide Flange Post
(4-8Up in Landscape Available)

Single Post EastWest System

2-4Up in Portrait - Screw or Helical Post
(4-8Up in Landscape Available)

Dual Post System

2-4Up in Portrait - Wide Flange Post
(4-8Up in Landscape Available)

Dual Post System

2-4Up in Portrait - Screw or Helical Post
(4-8Up in Landscape Available)

Dual Post EastWest System

2-4Up in Portrait - Wide Flange Post
(4-8Up in Landscape Available)

Dual Post EastWest System

2-4Up in Portrait - Screw or Helical Post
(4-8Up in Landscape Available)

Screw, Helical, and Driven Post Options

WIDE FLANGE
POST

ROLL FORMED
POST

SCREW
POST

HELICAL
POST

MaxSpan with Preassembled TwistClamps

Industry’s Biggest Breakthrough of the Decade in Install Speed for Fixed Tilt Structures

Preassembled “Swiss Army Knife” Beam

  • One worker carry by weight
  • Just bolt it onto post extender, cut zip tie, swing braces and brackets into position, and bolt down
  • All hardware and brackets pre-attached and in assembly kit
  • Super simple staging: one unit replaces previous staging of nuts, bolts, brackets, braces, and beam

TwistClamps Increase Install Speed 400%

  • 447 modules per worker day versus 100 with nuts and bolts
  • One worker inserts and twists all preassembled TwistClamps™ into purlins
  • Follow-on workers slide modules under TwistClamps™
  • Workers then use torque wrenches to do just one final rotation on the pre-attached serrated flange nyloc nut to reach required torque and simultaneously grounds the module
  • Modules always align even if posts and beams are far out of alignment since workers can slide modules north and south under TwistClamps™
  • No power tools or hardware needed
  • No follow-on torquing operations required

Superior Terrain Navigation Adjustability

Articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket adjustment handle up to 15% east‑west terrain slopes and undulations

Purlins for all MaxSpan™ systems have multiple mounting holes allowing 6"[15.24 cm] east‑west adjustability

WideFlange: Telescoping post bracket with up to 5"[12.7 cm] vertical adjustment for fast top of post leveling

Long slots allow 3.5"[8.89 cm]
vertical adjustability


Features

  • Supports all double-sided glass thin film & other modules
  • Up to 4 ft.[121.92 cm] ground clearance eliminates snow & vegetation shading issues
  • Galvanized Z purlins have integrated trays for easy wire management
  • 5 to 35° tilt with multiple inter-row spacing options
  • Stamped layout & engineering analysis for every project
  • Integrated grounding with star washers or teethed module clamps included - approved under ETL /UL 2703

Features

Self Hanging Purlin

  • Reduce labor for purlin mounting by 40% because two workers can place purlins on supports and then one worker can bolt them on versus five-worker team previously

Self Hanging Purlin

Superior Bankability

At GameChange Solar we're changing the world by making solar energy affordable

gamechange solar
GW+
OF GAMECHANGE SOLAR SYSTEMS
gamechange solar
. million+
SOLAR MODULES ON GAMECHANGE SOLAR SYSTEMS
gamechange solar
. million+
CO2 TONS OFFSET OVER 25YRS BY MODULES ON GAMECHANGE SYSTEMS
gamechange solar
. billion+
OIL GALLONS OFFSET OVER 25YRS BY MODULES ON GAMECHANGE SYSTEMS
gamechange solar
. million+
HOMES CAN BE POWERED BY THE ENERGY PRODUCED ON GAMECHANGE SYSTEMS