MAXSPAN

Best Quality & Priced Post Driven Fixed Tilt Systems

CLICK TO REQUEST A QUOTE

FASTER
INSTALLING

  • Integrated Hardware cuts part count and speeds install
  • Fewer foundations than competing systems, which also means less posts and less post installation cost. As few as 130 posts per MW

STRONGER
STEEL

  • High strength steel and truss engineering combine to make industry’s longest spans and lowest post counts as few as 190 per MW for 2 up portrait and 130 per MW for 3 up portrait
  • Stronger steel allows for less thickness and weight, which means lower equipment and shipping cost

SUPERIOR TERRAIN
NAVIGATION

  • Patent pending articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket adjustment handle up to 15% east-west terrain slopes and undulations
  • Long slots enable three axes of adjustability demanded by installers for navigating real world site conditions

Single Post System

2-4Up in Portrait

Single Post System

4-8Up in Landscape for Bifacial Modules

Dual Post System

2-4Up in Portrait and 4-8Up in Landscape

East/West Post System

Industry's Highest GCR System

MaxSpan with TwistClamps

Industry’s Biggest Breakthrough of the Decade in Install Speed for Fixed Tilt Structures

StubPost

  • With adjustable extender to handle rolling ground without grading
  • 35% shorter and lighter stub posts for faster handling and faster post driving
  • Install StubPost™
  • Install extender and base bracket at the same time

Preassembled “Swiss Army Knife” Beam

  • One worker carry by weight
  • Just bolt it onto post extender, cut zip tie, swing braces and brackets into position, and bolt down
  • All hardware and brackets pre-attached and in assembly kit
  • Super simple staging: one unit replaces previous staging of nuts, bolts, brackets, braces, and beam

TwistClamps Increase Install Speed 400%

  • 400 modules per worker day versus 100 with nuts and bolts
  • One worker inserts and twists all preassembled TwistClamps™ into purlins
  • Follow-on workers slide modules under TwistClamps™
  • Workers then use torque wrenches to do just one final rotation on the pre-attached serrated flange nyloc nut to reach required torque and simultaneously grounds the module
  • Modules always align even if posts and beams are far out of alignment since workers can slide modules north and south under TwistClamps™
  • No power tools or hardware needed
  • No follow-on torquing operations required

Superior Terrain Navigation Adjustability

Articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket adjustment handle up to 15% east‑west terrain slopes and undulations

Purlins for all MaxSpan™ systems have multiple mounting holes allowing 6"[15.24 cm] east‑west adjustability

WideFlange: Telescoping post bracket with up to 5"[12.7 cm] vertical adjustment for fast top of post leveling

Long slots allow 3.5"[8.89 cm]
vertical adjustability


Features

  • Supports all double-sided glass thin film & other modules
  • Up to 4 ft.[121.92 cm] ground clearance eliminates snow & vegetation shading issues
  • Galvanized Z purlins have integrated trays for easy wire management
  • 5 to 35° tilt with multiple inter-row spacing options
  • Stamped layout & engineering analysis for every project
  • Integrated grounding with star washers or teethed module clamps included - approved under ETL /UL 2703

Features

Self Hanging Purlin

  • Reduce labor for purlin mounting by 40% because two workers can place purlins on supports and then one worker can bolt them on versus five-worker team previously

Self Hanging Purlin

3-Up Portrait Option Available

  • Typically 5% or more lower system cost
  • Wider row spacing
  • Reduces number of foundations per MW up to 30%

3-Up Portrait Option Available

First Solar Series 4 Mounting Solutions

  • The GameChange MaxSpan offers a mounting solution for the high performing and efficient First Solar Series 4 module. Three First Solar Series 4 modules are held on top of each pair of purlins in landscape configuration.
  • The GameChange MaxSpan First Solar module configuration helps improve energy production by increasing the module density on each table.

First Solar Series 4 Mounting Solutions

Solar Frontier Mounting Rails

  • The GameChange MaxSpan offers a mounting solution for the high performing and efficient Solar Frontier CIS module. Two Solar Frontier CIS modules are held in between each pair of purlins in portrait configuration.
  • The GameChange MaxSpan CIS module configuration helps improve energy production by increasing the module density compared to the competition.

Solar Frontier Mounting Rails

Helical Post System - Single Post

  • Optimal for peat bogs and other very soft soils or areas with frost jacking concerns
  • Dual post also available

Helical Post System - Single Post

Superior Bankability

At GameChange Solar we're changing the world by making solar energy affordable

gamechange solar
.+
GIGAWATTS OF GAMECHANGE SOLAR SYSTEMS
gamechange solar
. million+
SOLAR MODULES ON GAMECHANGE SOLAR SYSTEMS
gamechange solar
. million+
CO2 TONS OFFSET OVER 25YRS BY MODULES ON GAMECHANGE SYSTEMS
gamechange solar
. billion+
OIL GALLONS OFFSET OVER 25YRS BY MODULES ON GAMECHANGE SYSTEMS