Integrated hardware™ reduces part count and speeds install
Fewer foundations than competing systems means fewer posts and lower post installation cost. As few as 130 posts per MW
Fewer installers required to install each EW Beam
STRONGER STEEL
High strength steel and truss engineering combine to make the industry’s longest spans and lowest post counts–as few as 190 per MW for 2 up portrait
Stronger steel allows for less thickness and weight, which means lower equipment and shipping cost
Lattice structure creates a stronger framework to support modules
SUPERIOR TERRAIN NAVIGATION
Articulating EW beams from post to post enables installation on sites with complex slope issues, which when combined with post and post bracket adjustment, handle up to 15% east-west terrain slopes and undulations
Long slots enable three axes of adjustability demanded by installers for navigating real-world site conditions
Standard Framed Module Configuration
Single Post System
2-Up in Portrait (4-UP Landscape Available)
Wide Flange Post Front View
Standard Framed Module Configuration
Single Post System
2-Up in Portrait (4-UP Landscape Available)
Wide Flange Post Back View
Just bolt it onto post extender, cut zip tie, swing braces and brackets into position, and bolt down
All hardware and brackets pre-attached and in assembly kit
Super simple staging: one unit replaces previous staging of nuts, bolts, brackets, braces, and beam
Superior Terrain Navigation Adjustability
Articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket adjustment handle up to 15% east‑west terrain slopes and undulations