Above: GameChange Solar Thin Film System Support First Solar Modules
NEW YORK, NEW YORK – April 4, 2016 – GameChange Solar today announced that it was awarded a 10 MW First Solar Series 4 module racking system order by a leading EPC in the southeast for shipment to Alabama.
Derick Botha, VP of Business Development for GameChange Solar, stated: “We have pushed hard to develop a leading quality racking system to support both First Solar Series 4 and Series 5 modules. We expect to ship over 300MW of the Series 4 supporting systems this year and to commence Series 5 supporting system shipments in 2017.”
MaxSpan™ Thin Film Post System
• Most cost effective racking system for thin film panels• Industry's best quality, test & certification and bankability
• Industry’s longest spans and fewest foundations - as few as 260 per MW
• Post/Beam/Brace assembly has industry’s lowest part count and fastest assembly
• Single operation top mount clamp attachment with screw into extruded hole, no nuts needed
• Articulating purlins for easy terrain navigation
• Wire management holes pre-punched in both north-south panel rails and east-west purlin wire management tray
• Rugged design enables 145 mph wind and 60 psf snow loads
• Turnkey install by GameChange Installation Services ("GIS") and geotech services available
• Mounts all poly and thin film modules including First Solar Series 4
• 20 year warranty
• ETL / UL 2703 tested
• Wind tunnel tested by industry leader CPP