Fastest Install Methods Unveiled In Time Study Released For GameChange Solar Pour-In-Place™ Ballasted Ground System


Pour-in-Place™ Ballasted Ground System Time Study Sheet

NEW YORK, NEW YORK – April 24, 2017 – GameChange Solar released a detailed time study which identified optimized installation methodologies for utilizing various means and methods for installing the GameChange Solar Pour-In-Place™ Ballasted Ground System.

Derick Botha, Vice President of Business Development at GameChange Solar, stated: “Having the lowest racking system cost is important, but project builders also need to know what the installation cost will be. As the leader in ballasted ground systems, we felt it was important to provide this time study as a tool to allow builders to more accurately bid the system into projects.

Since the Pour-in-Place system has self-leveling technology to handle rolling terrain, we have seen install costs typically in line with easy pile driven system installs once installers become familiar with the system, and far below that of precast ballasted ground systems.”

POUR-IN-PLACE™ BALLASTED GROUND SYSTEM

  • Patent pending protected system with self-leveling technology: 68% faster install than precast
  • Industry’s longest spans and fewest foundations: as few as 190 per MW
  • Substantial labor savings by eliminating moving and shimming heavy, precast blocks
  • Patent pending articulating purlin connections to navigate up to 15% terrain slopes
  • Supports all poly, glass and thin film modules
  • Integrated grounding and wire management

  • Available in both 1 and 2 panels up in portrait
  • Landfill solar racking leader
  • Base bracket hoops attach to posts, enable more than 7 inches total vertical adjustment to handle north-south terrain slopes
  • 20 men install 1.64MW per week using pump truck, 1.31MW per week using bobcats with pouring buckets