top of page
Pour-in-Place™
A leader for landfill reclamation and a great solution for rocky sites
The Pour-in-Place solar mounting system is an industry leader for landfill reclamation and an excellent solution for rocky sites. It offers significant cost savings, minimal impact on site drainage, and versatile adjustability for varied terrains.

PLACE
leave-behind tubs

BUILD
self-leveling racking

POUR
standard concrete



Cost and Efficiency
-
Up to 20% lower installation cost than traditional post or screw systems
-
No risk of pile refusal or complex remediation

Versatility and Adaptability
-
High-strength steel and truss engineering combine to make the industry’s longest spans and lowest post counts
-
Stronger steel allows for less thickness and weight for lower equipment and shipping cost



Comprehensive Project Support
-
Minimal impact on site drainage
-
Full layout and engineering analysis for every project
-
Integrated grounding and wire management
bottom of page